Planning stage of a project implementation

Yeah.. planning.. before the implementation starting to take place..
It would have been very useful to have all team member to completely
have at least the same understanding of current stake at hand..

This would then ease a lot pressure off our shoulder..
and also eliminate most un-necessary problem ahead.. if not all.. 🙂

Pics(1)

.. and also a stage where the team actually predict which route to actually / possibly take
to ensure the most suitable route to reach the project target..

… or any damage control shall taken place at some point of time later..
if somehow there will be a “calculated failure” is un-avoidable.. 😎

p/s : .. been there done that.. sort of.. event..

Related Post

3 Responses

  1. Anggi says:

    Thanks for installing CentOS guide

    Reply
  2. abhijit says:

    It is very good artical, but it didn’t contain the information about how to install CentOS 5.3 on Windows OS like win 7 if it is already installed it.

    Reply
  3. shivu says:

    thanks

    Reply

Leave a Reply

Your email address will not be published. Required fields are marked *